Historical and Projected
Timeline
1910
Original Joint Supply Canal Constructed
2017
Fall 2017, Condor Earth conducted a hazard study – recommended significant repair, maintenance, and stabilization activities that could be avoided through construction of a tunnel
2019
January 15, 2019, SSJID’s Board of Directors approved a contract with Condor Earth to initiate a feasibility study and 30 percent design
2020
April 28, 2020, SSJID’s Board approved advancing the project to the 60 percent design level
2023
January 2023, SSJID’s Board approved advancing the project to the 90 percent design level
2024
June 2024, SSJID’s Board approved advancing the project to the 95 percent design level
2025
Anticipate initiating 100% design in January 2025